← Leeham News
● LH
ANALYSIS
·Scott Hamilton
·August 25, 2026
·10:03Z
Second 737 North Line Likely Needed as Early as 2028: Analysis
Subscription Required By Scott Hamilton Aug. 24, 2026, © Leeham News: Before the 737 Max was grounded by the Federal Aviation Administration (FAA) in March 2019 for what would be 21 months, Boeing was in the process of boosting the production rate to 57 from
Detailed analysis
Detailed analysis coming soon.
Read original article