← Leeham News
● LH
ANALYSIS
·Scott Hamilton
·August 25, 2026
·10:03Z
Spirit Aerosystems Archives - Leeham News and Analysis
Second 737 North Line Likely Needed as Early as 2028: Analysis Subscription Required By Scott Hamilton Aug. 24, 2026, © Leeham News: Before the 737 Max was grounded by the Federal Aviation Administration (FAA) in March 2019 for what would be 21 months, Boeing
Detailed analysis
Detailed analysis coming soon.
Read original article